Assembling a new kitchen is one of the most exciting and at the same time, challenging in any home. Whether you're updating your kitchen current or by installing a from scratchOne of the most frequently asked questions is How long does it take to assemble a kitchen? The answer depends on several factors, from the size and the complexity from design to the availability of materials and professionals.
In this article, we offer you a detailed guide on the estimated times, the factors that influence the process and practical tips to make the experience as seamless as possible.
If you want everything to go perfectly from day one, in Cocinas Plus we accompany you throughout the process, from design to the final assembly.
It is not the same to set up a standard modular kitchen than one custom kitchen. Prefabricated kitchens usually have shorter assembly times, since the elements arrive ready to assembleIn contrast, a custom kitchen may require more time due to the manufacturing the specific furniture and countertops.
If the space where the kitchen will be installed needs preparatory work such as demolitions, soil leveling, either update of electrical and plumbing installations, the process is will lengthenA kitchen in a new build is usually quicker to install than a complete renovation.
The number of furniture, of large appliances integrated systems lightningand details such as islands or peninsulas they directly influence assembly time. How many more elements and personalized details, the greater the deadline will be.
The availability and coordination of the various guilds (Carpenters, electricians, fonta nero s, countertops, etc.) is key. A good schedule and a specialised company can significantly reduce times.

Do you have questions about how to get started? Cocinas Plus We help you evaluate each of these factors with personalized advice and without obligation.
The first step is to define the design of the kitchen, choose materials, colors, of large appliances and perform the measurementsThis process can take between one and three weeksdepending on the speed of decision-making and the availability of materials.
Ask for your free design quote Today!
Once the design is approved, the order for furniture, countertops, and appliances is placed. If it is a standard kitchenThe deadline is usually 2 to 4 weeks. For custom-made kitchens, especially with natural stone countertops or bespoke furniture, the timeframe may be longer up to 6 weeks or more.
If preliminary work is required, such as demolition, leveling of floors, or updating of facilities, this process may take between one and two weeksIn comprehensive renovations, this period may be longer.
The actual assembly of the kitchen furniture usually takes between 2 and 7 days, depending on the size and the complexity. If integrated appliances, lighting systems or special details must be installed, this may require a few additional days.
Countertops such as granite, quartz or porcelain are placed after assembling the furniture because it is necessary to measure them with great care so they fit perfectly. The timeframe may vary 3 to 7 days, depending on the material and the supplier's schedule.
Finally, a revision to verify that everything works correctly and space cleaning is later carried out.

Setting up a kitchen is a process that requires planning, patience and the collaboration of qualified professionals. This process can take different amounts of time, understand what affects the time it takes and follow some useful advice this will make it easier and faster so you can enjoy your new kitchen.
In Cocinas Plus we have more than 16.000 different combinations with more than 15 years of experience in the design and mounting of custom-made kitchens. We have our own equipment and provide a personalized attention at each stage of the project. If you are thinking of refurbishing your kitchen, do not hesitate to contact our team of experts to receive personalized advice and a free quote.