Assembling a new kitchen is one of the most exciting and at the same time, challenging In any home. Whether you are updating your kitchen current or installing one from scratch, one of the most frequent questions is How long does it take to assemble a kitchen? The answer depends on several factors, from the size and the complexity of design until availability of materials and professionals.
In this article, we offer you a detailed guide on the estimated times, the factors that influence the process and practical tips so that the experience is as fluid as possible.
If you want everything to go perfect from day one, in Cocinas Plus we accompany you throughout the process, from design to the final assembly.
It is not the same to set up a standard modular kitchen than one custom kitchen. Prefabricated kitchens usually have shorter assembly times, since the elements arrive ready to assemble. On the other hand, a personalized kitchen may require more time due to manufacturing the specific furniture and countertops.
If the space where the kitchen will be installed needs previous jobs such as demolitions, Soil leveling, either update of electrical and plumbing facilities, the process is will lengthen. A kitchen in new work is usually faster than a comprehensive reform.
The number of furniture, appliances Integrated, systems of lightning, and details like Islands or Peninsulas they directly influence assembly time. How many more elements and personalized details, the greater the deadline will be.
The availability and coordination of the different guilds (Carpenters, electricians, fonta nero s, countertops, etc.) is key. A good schedule and a specialised company can significantly reduce times.
Do you have doubts about how to start? In Cocinas Plus We help you evaluate each of these factors with personalized advice And without obligation.
The first step is to define the design of the kitchen, choose materials, colors, appliances and perform the measurements. This process can last between One and three weeks, depending on the speed in decision making and the availability of the materials.
Ask for your Free design appointment Today!
Once the design is approved, the request for furniture, countertops and appliances is made. If it is a standard kitchen, the deadline is usually 2 to 4 weeks. For custom kitchens, especially with natural stone countertops or custom furniture, the deadline can be extended up to 6 weeks or more.
If you need to perform previous works, such as demolitions, soil leveling, or facilities update, this process can carry between one and two weeks. In comprehensive reforms, this period may be greater.
The assembly itself of the kitchen furniture usually lasts between 2 and 7 days, depending on size and the complexity. If integrated appliances, lighting systems or special details must be installed, this may require a few additional days.
Countertops such as granite, quartz or porcelain are placed after assembling the furniture because it is necessary to measure them with great care to fit perfectly. The deadline may vary from 3 to 7 days, depending on the material and the supplier's agenda.
Finally, a revision to verify that everything works correctly and space cleaning is later carried out.
Mounting a kitchen is a process that requires planning, patience and the collaboration of qualified professionals. This process can take different amounts of time, understand what affects the time it takes and follow some useful advice this will make it easier and faster To enjoy your new kitchen.
In Cocinas Plus we have more than 16.000 different combinations with more than 15 years of experience in the design and mounting of custom kitchens. We have our own equipment and provide a Personalized attention at each stage of the project. If you are thinking of refurbishing your kitchen, do not hesitate to contact our team of experts to receive personalized advice and a Budget without obligation.